Progress on Wednesday included the assembly of the majority of the wall forms that will create the basement walls. First the footings were drilled and vertical pieces of rebar were inserted to tie the foundation walls to the footing. Then the actual wall forms were erected on the footings. Corrugated drain tile was also installed around the outer perimeter of the footings and will eventually be connected to the sump pump crock to keep water out of the basement. The rest of the forms should be completed on Thursday and, more than likely, the wall pours will take place.